• EN
  • SV
  • FI
  • FI
    |
    SV
  • Products
    • Casting parts
    • Ventilation Unit IVL-1
    • Shelter accessories
    • Installation Instructions and Leaflets
  • Services
    • New Construction
    • Renovation Projects
  • References
  • News
  • Company
    • Certifications and Legislation
  • Contact
Defense Equipment
ProductsInstallation Instructions and Leaflets

Products

  • Casting parts
  • Ventilation Unit IVL-1
  • Shelter accessories
  • Installation Instructions and Leaflets

Installation Instructions and Leaflets

Download the following installation instructions here (in Finnish):

Operating and Maintenance Manual for S1-Class Civil Defense Shelter (PDF)

Civil Defense Shelter Door SO-1 and Protective Hatch HS-1 (PDF)

Ventilation Wall sleeves and Covers

Ventilation Unit IVL-1 (PDF)

Overpressure Valve YV-1 (PDF)

Overpressure Meter YM-3 (PDF)

Air Inlet Valve TV-3 (PDF)

 

Download the following brochures here (in Finnish):

Protective Door SO-1 (PDF)

Protective Hatch HS-1 (PDF)

Ventilation Unit IVL-1 (PDF)

Overpressure Valve YV-1 (PDF)

Air Inlet Valve TV-3 (PDF)

JTK Power Finland
2465227-3
Teollisuustie 6
66600 VÖYRI FINLAND

Contact Us